This project was part of the South Florida Water Management District’s Everglades Restoration Plan. It involved the construction of a pump station utilizing axial pumps and the installation of berms and levees. Additionally, the scope of work for this project included earthwork, electrical, HVAC, instrumentation, fuel systems, rip rap, sheet pilings, tie-back system, blasting, service bridge, MOT, concrete work, and a concrete tilt-wall structure.