Removed and replaced a stainless-steel bar screen splitter box at the Cardinal Hill Wastewater Treatment Facility. Work included coordination with city utilities to divert flow to a temporary headworks system, demolition and disposal of the existing screen, installation of a custom-fabricated Evoqua stainless-steel bar screen, re-plumbing of influent and effluent connections, and testing of operational controls. The project required close coordination with plant operations to minimize downtime and maintain environmental compliance.